wearerefa.blogg.se

Fission uranium drill results
Fission uranium drill results







fission uranium drill results

Fission 3.0 currently has 16 projects in the Athabasca Basin.

FISSION URANIUM DRILL RESULTS GENERATOR

is a uranium project generator and exploration company, focusing on projects in the Athabasca Basin, home to some of the world's largest high-grade uranium discoveries.

fission uranium drill results

Drill hole PLN 14-019 intercepted a 7.5 m interval (191.5 m - 199.0 m) of anomalous radioactivity with peak measurements up to 1450 cps (as measured by handheld spectrometer) over 0.5 m within a strongly clay altered and brecciated graphitic gneiss which assayed 0.5 m of 0.47% U 3O 8 within 6.0 m of 0.12% U 3O 8.įission 3.0 Corp. Previous drilling at PLN by Fission 3 in 2014 identified a mineralized structure associated with the ~3 km long A1 conductor with strongly anomalous geochemistry, including uranium values, in addition to common pathfinder elements including boron, copper, nickel and zinc. where uranium mineralization has been traced by core drilling at PLS over ~3.18 km of east-west strike length in five separated mineralized "zones" which collectively make up the Triple R deposit, and where a Feasibility Study has commenced. The Patterson Lake North property (PLN) lies adjacent and immediately north of the Patterson Lake South property (PLS), owned by Fission Uranium Corp. The drill holes will test for the potential that this feature is caused by clay alteration and/or dissolution of the sandstone matrix above uranium mineralization associated with basement structures delineated by the EM conductors. Two deep drill holes will test these basement conductors beneath the sandstone hosted "Chimney" resistivity anomaly. The N Conductors in the northeast part of the property are interpreted as multiple parallel basement EM conductors with an overlying low resistivity zone referred to as the "Chimney" target in the lower part of the sandstone above the 1-km wide conductor complex. The Broach Lake conductors are ~9 km to the north, adjacent and parallel to EM conductors of the Patterson Lake Structural Corridor, host to Fission Uranium's Triple R deposit and NexGen's Arrow Deposit.įive drill holes planned at Broach Lake will test the two previously defined conductors, a cross cutting basement resistivity low anomaly, as well as the new third conductor. Ground geophysics is in progress at the A1 conductor to develop drill targets for summer 2022 drilling, consisting of 14 line-km of DC Resistivity and 4 line-km of Time Domain Electromagnetic (TDEM) surveying. The ground geophysics is ongoing and is expected to refine the other Broach Lake drill targets and consists of 22 line-km of DC Resistivity and 18 line-km of Time Domain Electromagnetic (TDEM) surveying.

fission uranium drill results

The ground geophysics has recently identified a new third conductor at Broach Lake which will be drill tested. The orientation of five drill holes planned at Broach Lake will be based on the results of the ground geophysics that commenced in December 2021. Follow up drilling of the A1 conductor is planned for the summer of 2022, to be guided by the ground geophysics that is currently in progress. The A1 conductor remains untested to the northwest over a further 800m strike length.

fission uranium drill results

Previous drilling by Fission 3 at the ~ 3 km long A1 conductor intersected basement hosted uranium mineralization supported by the presence of alteration, pathfinder elements and structural disturbance reinforcing the large-scale potential of the project. PLN is one of the most advanced and highest ranked projects in F3's extensive portfolio by virtue of its proximity to the large, high-grade world class uranium deposits being advanced by Fission Uranium Corp and NexGen and having multiple untested and prospective targets for high grade uranium. Drilling with two diamond drills will focus on the previously untested Broach Lake and N Conductor targets. January 10, 2022) - FISSION 3.0 CORP (TSXV: FUU) ( OTCQB: FISOF) (" Fission 3" or "the Company") is pleased to announce that mobilization is underway for the 4000m seven hole winter drill program on its 100% owned Patterson Lake North "PLN" project in the southwest Athabasca Basin region of Saskatchewan, Canada. Kelowna, British Columbia-(Newsfile Corp.









Fission uranium drill results